August 2024
We are currently working on some reworks on the detention pond and some of the pavement in the back corner per the city's request. The HVAC is installed at lot 2. Final roofing is being scheduled and we are coordinating scheduling with other traders to finish the construction.
March 2024
The City of Napa has requested a minor alteration to the bio detention area. That new design has been approved by the City of Napa and the construction in the field reflecting those changes should be completed in the next week. Once the bio detention changes have been completed in the field, final inspection of the horizontal development will be scheduled with the City of Napa for final sign off.
Lot 2 home build is coming close to completion. Countertops have been installed throughout the house, both upper and lower floors. Paint has been completed throughout upper and lower floors. Flooring is being ordered and delivered for install. The last portion of the exterior stucco is scheduled for this Saturday. The last portion of roofing will be completed after that.
January 2024
The last punch list item from the City to complete the subdivision agreement for all underground work is to add a special dirt to the detention pond that will create a more effective angle of draining into the storm drains. Once it stops raining, we will be draining the detention pond to put in the dirt. Once done, we will schedule the final inspection with Napa to get approved. This will complete the subdivision improvements.
As for individual homes, all three homeowners in Lots 1, 4, and 5 are moved in and happy. Lot 2 is the only one under construction now. We have everything taped off with plastic to keep heat in so painters can finish painting the cabinets.
Interior: Once all the painting is finished the flooring will be installed. Countertops templates and measurements have been completed. Appliances have been purchased and are in storage, ready to be installed.
Exterior: Upper level roof tiles on and final stucco coat is complete. The lower level is ready for the stucco coat. The roofing guys will coming to do the lower level tile. Weather permitting landscaping begin and the backyard has been prepped.